You must have Javascript enabled to see this menu.
Search:
Email Friend
print page
Procurement and Contracts
Contract Library
Procurements in Progress
All Master Contracts
Connectivity Contracts
Hardware Contracts
Professional Services Contracts
Software Contracts
Telecommunications Contracts
Consulting and Technical Services (CATS I)
Consulting and Technical Services (CATS II)
Home
Procurement and Contracts
Policies and Guidance
Operations and Support
Home
>
Procurement and Contracts
>
Cable Wiring SWORFQ - Sequential Selection
Cable and Wiring SWORFQ Ordering Process: Sequential Selection
Complete the
SWORFQ Part I, Section 1 – Small Work Order Information
.
Follow the
ADPICS Procedures
to create an agency purchase order (PO).
Enter the requested start and end dates for the work to be performed.
Enter the address of the location where the work is to be performed.
Complete the
SWORFQ Part I, Section 2 – Agency POC Information
. The Agency point of contact (POC) is the person responsible for managing the SWORFQ. Responsibilities may include approval of deliverables, testing, walk-throughs, acceptance of work; and approval of payment.
Complete the
SWORFQ Part I, Section 3 – Agency On-site POC Information
. This is contact information for the on-site POC if different from the Agency POC.
Complete the
SWORFQ Part I, Section 4 – Scope of Work
. The scope of work must include:
Date and time of the site survey.
Detailed description of the work to be performed. Include any unique requirements such as restrictions on the time of day work can be performed, etc.
Note: If a specific manufacturer or product line is required, the Agency must use the
Competitive Selection process
.
Documentation requirements (e.g., design drawings, detailed specifications, etc. See RFP Sections 2.3.2, and 2.3.8). If design and/or as-built drawings are required, identify the required Computer Aided Design (CAD) software and version to be used.
Testing requirements, if they vary from those defined in the Master Contract RFP (See RFP Sections 2.3.3, 2.3.4, 2.3.10 and 2.3.11).
A description of the responsibilities of the on-site POC, if applicable.
Additional specifications as required.
Email the
SWORFQ Part I
to the
FIRST
ranked Master Contractor listed below.
1st - Fiber Plus, Inc.
rantonacci@fiberplusinc.com
2nd - Plexus Installations, Inc.
pborden@plexus-group.net
3rd - Tel –Net Group, Inc.
mikeb@tel-netgroup.com
4th - Technology Alliance, LLC.
jhuggins@techalliancellc.com
5th - Verizon Select Services, Inc.
michael.a.bonaccorsi@verizonbusiness.com
Monitor for a response from the Master Contractor. If the Master Contractor declines to submit a price quote, document the response and reasons why in the
SWORFQ Part II, Section I - Master Contractor Response
. If the Master Contractor intends to submit a price quote:
Schedule a site survey within seven business days of the date of the SWORFQ.
Request a
Detailed Price Quotation
due within three business days after the site survey.
Evaluate the Detailed Price Quotation for adherence to:
The requirements defined in the
SWORFQ Part I, Section 4 – Scope of Work
The requirements of the Master Contract RFP, and
Equal or lower prices than those established in the Master Contractor’s
Price List
(Note: if total price exceeds $25,000, the Agency must cancel the SWORFQ and use the
TORFP process
).
If the Master Contractor fails to conduct a timely site survey, or if the Detailed Price Quotation is late or unacceptable, the Agency may seek to cure the situation to the Agency’s satisfaction. Otherwise, the Agency may eliminate a Master Contractor from consideration via an email providing the reasons why. The Agency must retain all email and other supporting documentation associated with an elimination.
Upon an elimination, the Agency may repeat Steps 5 through 7 above by going to the
NEXT
Master Contractor on the list. If the Agency exhausts the list in Step 5 above without obtaining an acceptable price quote, the Agency should contact the DoIT Procurement Office at
itpo@doit.state.md.us
.
Award the task order to the sequential Master Contractor who first submits an acceptable Detailed Price Quotation according to the criteria in Step 6C above.
Follow the
ADPICS Procedures
to complete, post, sign and transmit to the Master Contractor the purchase order created in Step 1A above. The Master Contractor, unless otherwise specified in the SWORFQ, is required to begin work no later than five business days upon receipt of the signed purchase order.
Document all responses received from Master Contractors by completing the
SWORFQ Part II, Section I - Master Contractor Response
.
Manage and document work progress by following the
Steps for Managing / Documenting Work Progress after an SWORFQ Award
and completing the
SWORFQ Part II, Section II –Status of Work Order
.
Document any amendments to the scope of work, or stop work orders, by completing the
SWORFQ Part II, Section III – Amendment / Stop Work
. Note that:
Master Contractors must be notified in writing of amendments or stop work orders.
Only reductions in scope are permitted. If additional work or materials are required, the Agency must start a new procurement under this contract.
Cable and Wiring Links
Cable and Wiring Contract Home Page
Functional Areas: Descriptions/Examples
ADPICS Procedures
Frequently Asked Questions (FAQ)
Required Standards
Master Contractors' Contact Information
Master Contractor Pricing
Master Contractor Login
Contract Award Information